Saturday , June 7th 2025
    Best Deals on Dog and Puppy Care, Products and Supplies

YOGADOG – Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash – Long Lead with Padded Handle – Special Non-slip Design – For any Szie of Dogs (15ft)

Product Features:

    Size and Color S: 10 ft long x 0.7 inch wide. Color: black and green M: 15 ft long x 0.7 inch wide. Color: black and red L: 33 ft long x 0.7 inch wide. Color: black and red XL: 50 ft long x 0.7 inch wide. Color: blue…
Price as on: 2017-11-14 14:57:26
34.99   22.59

Product Description

Size and Color

S: 10 ft long x 0.7 inch wide. Color: black and green
M: 15 ft long x 0.7 inch wide. Color: black and red
L: 33 ft long x 0.7 inch wide. Color: black and red
XL: 50 ft long x 0.7 inch wide. Color: blue and green

Feature

¡¤High-quality nylon strap with woven-in rubber strips
¡¤Extra robust
¡¤Non-slip with maximum grip
¡¤Neoprene padded hand loop
¡¤For dog training, e.g. when training requires distance
¡¤For tracking work or searching for wounded game (hunting)
¡¤For more freedom of movement

Choose a suitable length to buy! And enjoy the funny time with your pets!

YOGADOG – Only provide hight quality pet products. Bringing to you and your pet with joy and fun in the life.

Product Features

  • STURDY AND DURABLE – 15 ft long x 0.7 inch wide. High-quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
  • SPECIAL NON-SLIP DESIGN – With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
  • COMFORTABLE PADDED HANDLE – With neoprene padded hand loop. Lightweight and comfortable in your hands.
  • CONVENIENT USE – Twisting resistant and waterproof. Suitable for any weather and any size of dogs.
  • WIDE APPLICABILITY – Works great for tracking work like searching/hunting or training like recall/distance commands. And more freedom of movement on Long-distance outdoor activities.